SQL Server Upgrade & Migration
Move to a supported SQL Server version with a tested plan and a way back, and without carrying old security problems over to the new server.
SQL Server 2016 left extended support on July 14, 2026, and SQL Server 2017 follows on October 12, 2027. Most migrations I see are centered around the databases alone. But what often breaks is on the server: certificates and keys in master, linked servers, jobs, FILESTREAM settings. This is where I put the extra diligence to avoid later surprises.
My recommendations
Side by side. I generally recommend a side-by-side migration over an in-place upgrade. In theory, an in-place upgrade is faster, but its only real rollback is a full reinstall and restore – everything happens on the live system. Side by side allows you to test on the real target before the cutover, and you can move one application at a time, giving you time to adjust. The old server remains your fallback as long as needed.
On premises is often the right target. For many latency-sensitive workloads and systems with special security requirements, running SQL Server on your own hardware or VMs is the better choice. But there is no answer that fits all. Azure SQL Managed Instance, Azure SQL Database, Amazon RDS or SQL Server on a cloud VM can be the right move too. I will help you determine which hosting option makes most sense for you.
Don’t copy everything – declutter first. A migration is the best chance in years to drop logins nobody uses and permissions nobody needs. Copying everything over 1:1 just moves the old risks to a new server.
What I check before a migration
My migration checklist goes through five levels: the operating system, the SQL Server instance, master, msdb and every database, plus the applications and their vendors. Most of it is routine. The trouble comes from the things nobody wrote down, for example:
- ODBC data sources and drivers on the old server that an application still uses
- server triggers, startup procedures and custom error messages in master
- Agent proxies, operators and Database Mail in msdb
- FILESTREAM, replication or change data capture in a database
- an application vendor that doesn’t support the new version or compatibility level yet
The full list stays in the project. Here is where my focus differs from most migrations:
Security doesn’t move by itself
Logins need their original SIDs, or database users end up orphaned. Databases with Transparent Data Encryption can’t be restored without their certificate, and encrypted backups can’t be read without theirs (data at rest options). Linked server passwords can’t be scripted out, and a new server means new SPNs. If they’re missing, connections quietly fall back to NTLM, which Microsoft is disabling by default (NTLM deprecation and SQL Server). And applications that need sysadmin can’t share a server with others; they get their own.
Sizing from real data
I size the new servers from measured usage over at least 31 days, including one month-end, not from VMware counters. Some systems run only once a year, and they need to be on the list too. SQL Server is licensed per core, so right-sizing also lowers the licensing bill.
High availability on the target
Availability groups, failover cluster instances or log shipping, chosen by the SLA of each application. On SQL Server 2022 and later, contained availability groups carry logins and Agent jobs with the databases: why I recommend contained availability groups.
Compatibility level and a performance baseline
I capture a Query Store baseline on the old server, start on the new one with the old compatibility level, and raise it once the workload runs as before. That way an upgrade can’t quietly make queries slower.
How I work
- Inventory first: which instances, databases and applications exist, and what depends on what. SQL Server Instance Discovery helps when the list isn’t complete.
- Applications with your IT team: maintenance windows, SLAs, expected growth, and the vendor’s sign-off for the target version.
- Plan per application: target platform, migration method (backup and restore, log shipping, or an availability group or cluster upgraded node by node, depending on the downtime you can allow), and a fallback plan for each system.
- Test migration on the real target, with your application team.
- Cutover: integrity checks before and after, access to the old server blocked, the old server kept as the fallback.
- After go-live: your users test, performance is compared with the baseline, the new server gets a security review, and the old one is decommissioned once everyone has signed off.
Every step is documented in a migration plan per application.
What you get
- An inventory and a migration plan per application, with the order of the moves.
- A tested migration and a rollback path for each step.
- The new servers reviewed for security: permissions, configuration and patch level.
- A performance baseline to compare against after the move.
- On request, I do the migration or support your team in doing it.
For a US regional health system, I planned and implemented a SQL Server consolidation with my team at Sarpedon Quality Lab: 160+ SQL Server instances assessed, about 50 business applications in the migration plan, $3M+ in projected licensing savings. Read the case study
Plan your SQL Server migration
Tell me briefly which versions you run and where you want to go. I’ll usually get back to you within one business day.
Prefer to talk first? Book a 20-minute call directly in my calendar.
For larger programs, I work with my team at Sarpedon Quality Lab: SQL Server migration and upgrade services.

